Approximate Optimality of Linear Contracts Under Uncertainty
Not on the map. Why?
Abstract (arXiv)
We consider a hidden-action principal-agent model, in which actions require different amounts of effort, and the agent privately knows his ability that determines his cost of effort. We show that linear contracts admit approximation guarantees that improve with a natural metric that captures the degree of uncertainty in the contracting setting. We thus show that linear contracts are near-optimal whenever there is enough uncertainty. In contrast, other simple contract formats such as debt contracts may suffer from a loss linear in the number of possible actions, even when there is sufficient uncertainty.
Key facts. Cited by 7 papers in the map (data through 14 Oct 2026). First posted on arXiv 13 Nov 2022.
Builds on
No reference list yet.
Built on by
Citing papers per year: 2023: 4; 2024: 2; 2025: 1.
7 papers.
- 2024Contracting with a Learning Agentcited by 23
- 2023Deep Contract Design via Discontinuous Networkscited by 11
- 2023Delegating Data Collection in Decentralized Machine Learningcited by 8
- 2024Are Bounded Contracts Learnable and Approximately Optimal?cited by 6
- 2023Learning Optimal Contracts: How to Exploit Small Action Spacescited by 5
- 2025The Backfiring Effect of Weak AI Safety Regulationcited by 3
- 2023Operationalizing Counterfactual Metrics: Incentives, Ranking, and Information Asymmetrycited by 2
- 2025The Backfiring Effect of Weak AI Safety Regulation26 Mar 2025
- 2024Are Bounded Contracts Learnable and Approximately Optimal?22 Feb 2024
- 2024Contracting with a Learning Agent29 Jan 2024
- 2023Learning Optimal Contracts: How to Exploit Small Action Spaces18 Sep 2023
- 2023Delegating Data Collection in Decentralized Machine Learning4 Sep 2023
- 2023Deep Contract Design via Discontinuous Networks5 Jul 2023
- 2023Operationalizing Counterfactual Metrics: Incentives, Ranking, and Information Asymmetry24 May 2023