mlsanityData to 14 Oct 2026

An Integrated Framework Integrating Monte Carlo Tree Search and Supervised Learning for Train Timetabling Problem

arXiv 2311.00971 ↗First posted 2 Nov 2023cs.LG cs.AI cs.CEcited by 5

Not on the map. Why?

Abstract (arXiv)

The single-track railway train timetabling problem (TTP) is an important and complex problem. This article proposes an integrated Monte Carlo Tree Search (MCTS) computing framework that combines heuristic methods, unsupervised learning methods, and supervised learning methods for solving TTP in discrete action spaces. This article first describes the mathematical model and simulation system dynamics of TTP, analyzes the characteristics of the solution from the perspective of MCTS, and proposes some heuristic methods to improve MCTS. This article considers these methods as planners in the proposed framework. Secondly, this article utilizes deep convolutional neural networks to approximate the value of nodes and further applies them to the MCTS search process, referred to as learners. The experiment shows that the proposed heuristic MCTS method is beneficial for solving TTP; The algorithm framework that integrates planners and learners can improve the data efficiency of solving TTP; The proposed method provides a new paradigm for solving TTP.

Key facts. Cited by 5 papers in the map (data through 14 Oct 2026). Builds on 3 of its 55 references that are in the map. First posted on arXiv 2 Nov 2023.

Builds on

3 of 55 references.

References · 3

  1. 2021Monte Carlo Tree Search: A Review of Recent Modifications and Applicationscited by 161
  2. 2021DouZero: Mastering DouDizhu with Self-Play Deep Reinforcement Learningcited by 66
  3. 2015Combining Monte-Carlo and Hyper-heuristic methods for the Multi-mode Resource-constrained Multi-project Scheduling Problemcited by 3

Built on by

Cited by year

Citing papers per year: 2024: 3; 2025: 2.

5 papers.