mlsanityData to 7 Oct 2026

Safe POMDP Online Planning via Shielding

arXiv 2309.10216 ↗First posted 19 Sep 2023cs.AIcited by 8

Not on the map. Why?

Abstract (arXiv)

Partially observable Markov decision processes (POMDPs) have been widely used in many robotic applications for sequential decision-making under uncertainty. POMDP online planning algorithms such as Partially Observable Monte-Carlo Planning (POMCP) can solve very large POMDPs with the goal of maximizing the expected return. But the resulting policies cannot provide safety guarantees which are imperative for real-world safety-critical tasks (e.g., autonomous driving). In this work, we consider safety requirements represented as almost-sure reach-avoid specifications (i.e., the probability to reach a set of goal states is one and the probability to reach a set of unsafe states is zero). We compute shields that restrict unsafe actions which would violate the almost-sure reach-avoid specifications. We then integrate these shields into the POMCP algorithm for safe POMDP online planning. We propose four distinct shielding methods, differing in how the shields are computed and integrated, including factored variants designed to improve scalability. Experimental results on a set of benchmark domains demonstrate that the proposed shielding methods successfully guarantee safety (unlike the baseline POMCP without shielding) on large POMDPs, with negligible impact on the runtime for online planning.

Key facts. Cited by 8 papers in the map (data through 7 Oct 2026). Builds on 8 of its 20 references that are in the map. First posted on arXiv 19 Sep 2023.

Builds on

8 of 20 references.

References · 8

  1. 2016DESPOT: Online POMDP Planning with Regularizationcited by 105
  2. 2022Partially Observable Markov Decision Processes in Robotics: A Surveycited by 81
  3. 2022Safe Reinforcement Learning via Shielding under Partial Observabilitycited by 49
  4. 2014Online Planning Algorithms for POMDPscited by 42
  5. 2020Enforcing Almost-Sure Reachability in POMDPscited by 13
  6. 2016Optimizing Expectation with Guarantees in POMDPs (Technical Report)cited by 7
  7. 2018Expectation Optimization with Probabilistic Guarantees in POMDPs with Discounted-sum Objectivescited by 4
  8. 2021Planning for Automated Vehicles with Human Trustcited by 2

Built on by

Cited by year (2026 to 7 Oct)

Citing papers per year: 2024: 1; 2025: 2; 2026: 5.

8 papers.