mlsanityData to 14 Oct 2026

Intent-Driven UAM Rescheduling

arXiv 2512.15462 ↗First posted 17 Dec 2025cs.AI cs.HC cs.SCcited by 0

Not on the map. Why?

Abstract (arXiv)

Due to the restricted resources, efficient scheduling in vertiports has received much more attention in the field of Urban Air Mobility (UAM). For the scheduling problem, we utilize a Mixed Integer Linear Programming (MILP), which is often formulated in a resource-restricted project scheduling problem (RCPSP). In this paper, we show our approach to handle both dynamic operation requirements and vague rescheduling requests from humans. Particularly, we utilize a three-valued logic for interpreting ambiguous user intents and a decision tree, proposing a newly integrated system that combines Answer Set Programming (ASP) and MILP. This integrated framework optimizes schedules and supports human inputs transparently. With this system, we provide a robust structure for explainable, adaptive UAM scheduling.

Key facts. No citing papers in the map yet (data through 14 Oct 2026). Builds on 8 of its 35 references that are in the map. First posted on arXiv 17 Dec 2025.

Builds on

8 of 35 references.

References · 8

  1. 2021CX-ToM: Counterfactual Explanations with Theory-of-Mind for Enhancing Human Trust in Image Recognition Modelscited by 20
  2. 2019Declarative Learning-Based Programming as an Interface to AI Systemscited by 3
  3. 2023Agent 3, change your route: possible conversation between a human manager and UAM Air Traffic Management (UATM)cited by 2
  4. 2023We, Vertiport 6, are temporarily closed: Interactional Ontological Methods for Changing the Destinationcited by 2
  5. 2016Preference at First Sightcited by 1
  6. 2021Capacity-Constrained Urban Air Mobility Schedulingcited by 1
  7. 2023Dialogue Possibilities between a Human Supervisor and UAM Air Traffic Management: Route Alterationcited by 1
  8. 2024ASP-based Multi-shot Reasoning via DLV2 with Incremental Groundingcited by 1

Built on by

Not cited yet.