mlsanityData to 14 Oct 2026

Scheduling Lower Bounds via AND Subset Sum

arXiv 2003.07113 ↗First posted 16 Mar 2020cs.DScited by 1

Not on the map. Why?

Abstract (arXiv)

Given N instances (X1,t1),ldots,(XN,tN) of Subset Sum, the AND Subset Sum problem asks to determine whether all of these instances are yes-instances; that is, whether each set of integers Xi has a subset that sums up to the target integer ti. We prove that this problem cannot be solved in time tildeO((N · tmax)1-ε), for tmax=maxi ti and any ε > 0, assuming the forall exists Strong Exponential Time Hypothesis (forall exists-SETH). We then use this result to exclude tildeO(n+Pmax · n1-ε)-time algorithms for several scheduling problems on n jobs with maximum processing time Pmax, based on forall exists-SETH. These include classical problems such as 1||sum wjUj, the problem of minimizing the total weight of tardy jobs on a single machine, and P2||sum Uj, the problem of minimizing the number of tardy jobs on two identical parallel machines.

Key facts. Cited by 1 paper in the map (data through 14 Oct 2026). First posted on arXiv 16 Mar 2020.

Builds on

No reference list yet.

Built on by

Cited by year

Citing papers per year: 2021: 1.

1 paper.