mlsanityData to 14 Oct 2026

Learning Burst-Aware Early Warning Models for Capacity Stress under AI Workload Surges in Hyperscale Data Centers

arXiv 2606.21130 ↗First posted 19 Jun 2026cs.AIcited by 0

Not on the map. Why?

Abstract (arXiv)

The rapid growth of large-scale AI workloads, particularly Large Language Model (LLM) training and inference, is fundamentally reshaping the operational dynamics of hyperscale data centers. Unlike traditional cloud workloads, AI-driven jobs exhibit bursty, high-intensity, and rapidly shifting resource demands, often leading to sudden capacity stress that cannot be effectively handled by reactive threshold-based mechanisms. In this paper, we propose a deployment-oriented, burst-aware early warning framework for proactive capacity stress prediction under AI workload surges. We formulate the problem as a high-recall forecasting task over multivariate telemetry windows, with the explicit goal of enabling operational intervention before system degradation occurs. The proposed framework integrates workload intensity, temporal variation, and system pressure signals, and employs a lightweight tree-based learning model to capture nonlinear interactions in highly imbalanced environments. To evaluate the system under realistic conditions, we introduce an AI workload surge injection methodology that simulates burst-driven demand patterns observed in large-scale AI systems. Our XGBoost-based model achieves an ROC AUC of 0.697 and an AP of 0.670, significantly outperforming baseline methods. Under deployment-oriented threshold selection, the framework achieves a Recall of 0.914, enabling the detection of the majority of stress-prone periods with acceptable false-alarm cost. Beyond predictive performance, we show how the proposed framework can be integrated into operational control loops to support proactive actions such as workload throttling and resource scaling. Our results highlight the practical value of high-recall, learning-based early warning systems in enabling resilient and adaptive data center operations in the era of AI-driven workloads.

Key facts. No citing papers in the map yet (data through 14 Oct 2026). Builds on 5 of its 14 references that are in the map. First posted on arXiv 19 Jun 2026.

Builds on

5 of 14 references.

References · 5

  1. 2016XGBoost: A Scalable Tree Boosting Systemcited by 5,166
  2. 2020FIRM: An Intelligent Fine-Grained Resource Management Framework for SLO-Oriented Microservicescited by 41
  3. 2025AutoNeural: Co-Designing Vision-Language Models for NPU Inferencecited by 17
  4. 2025Learning How to Use Tools, Not Just When: Pattern-Aware Tool-Integrated Reasoningcited by 15
  5. 2024Beyond Math: Stories as a Testbed for Memorization-Constrained Reasoning in LLMscited by 12

Built on by

Not cited yet.