Designing Datacenter Power Delivery Hierarchies for the AI Era
Not on the map. Why?
Abstract (arXiv)
Demand for AI accelerators is rapidly increasing rack power density, with projections approaching 1MW per deployment by 2027. This poses a major challenge for datacenter power delivery designers. As power densities increase, a datacenter designed for a different target density may strand power, i.e., may be unable to use all the power that its delivery hierarchy has provisioned. Designs must remain efficient over long datacenter lifetimes and multiple hardware generations. Power utilization is particularly important as grid power capacity is a scarce resource in the AI era. Designing an efficient power delivery hierarchy for the long run is difficult because rack placement feasibility, workload impact, and cost depend jointly on electrical topology, deployment granularity, placement policy, power oversubscription, and workload mix. Moreover, each of these factors evolve over time, have inter-dependencies across multiple resource dimensions, and generally do not lend themselves to closed-form analysis. To address this challenge, we develop a framework for evaluating datacenter power delivery designs using throughput, power, and cost metrics over realistic arrival, oversubscription, and decommissioning sequences. The framework combines projection models for GPU, compute, and storage deployments with operational factors grounded in production data from Microsoft Azure. Our results show that multi-resource stranding materially changes deployable capacity, effective capital expenditure, and delivered performance, and quantify how rising density from rack- and pod-scale AI systems shapes these outcomes. For AI datacenter design, the relevant planning objective is not installed megawatts, but deployable capacity over time.
Key facts. No citing papers in the map yet (data through 14 Oct 2026). Builds on 11 of its 61 references that are in the map. First posted on arXiv 15 May 2026.
Builds on
11 of 61 references.
References · 11
- 2023Efficient Memory Management for Large Language Model Serving with PagedAttentioncited by 5,944
- 2024DistServe: Disaggregating Prefill and Decoding for Goodput-optimized Large Language Model Servingcited by 617
- 2023Splitwise: Efficient generative LLM inference using phase splittingcited by 558
- 2022DeepSpeed-MoE: Advancing Mixture-of-Experts Inference and Training to Power Next-Generation AI Scalecited by 404
- 2025TAPAS: Thermal- and Power-Aware Scheduling for LLM Inference in Cloud Platformscited by 29
- 2023Reducing Energy Bloat in Large Model Trainingcited by 22
- 2025PrefillOnly: An Inference Engine for Prefill-only Workloads in Large Language Model Applicationscited by 21
- 2020Prediction-Based Power Oversubscription in Cloud Platformscited by 6
- 2017Overcommitment in Cloud Services -- Bin packing with Chance Constraintscited by 5
- 2025Scaling Intelligence: Designing Data Centers for Next-Gen Language Modelscited by 3
- 2025Rearchitecting Datacenter Lifecycle for AI: A TCO-Driven Frameworkcited by 2
Built on by
Not cited yet.