Delay-Aware Multi-Stage Edge Server Upgrade with Budget Constraint

arXiv 2512.16792 ↗First posted 18 Dec 2025cs.DC cs.AIcited by 0

Not on the map. Why?

Abstract (arXiv)

In this paper, the Multi-stage Edge Server Upgrade (M-ESU) is proposed as a new network planning problem, involving the upgrading of an existing multi-access edge computing (MEC) system through multiple stages (e.g., over several years). More precisely, the problem considers two key decisions: (i) whether to deploy additional edge servers or upgrade those already installed, and (ii) how tasks should be offloaded so that the average number of tasks that meet their delay requirement is maximized. The framework specifically involves: (i) deployment of new servers combined with capacity upgrades for existing servers, and (ii) the optimal task offloading to maximize the average number of tasks with a delay requirement. It also considers the following constraints: (i) budget per stage, (ii) server deployment and upgrade cost (in ) and cost depreciation rate, (iii) computation resource of servers, (iv) number of tasks and their growth rate (in %), and (v) the increase in task sizes and stricter delay requirements over time. We present two solutions: a Mixed Integer Linear Programming (MILP) model and an efficient heuristic algorithm (M-ESU/H). MILP yields the optimal solution for small networks, whereas M-ESU/H is used in large-scale networks. For small networks, the simulation results show that the solution computed by M-ESU/H is within 1.25% of the optimal solution while running several orders of magnitude faster. For large networks, M-ESU/H is compared against three alternative heuristic solutions that consider only server deployment, or giving priority to server deployment or upgrade. Our experiments show that M-ESU/H yields up to 21.57% improvement in task satisfaction under identical budget and demand growth conditions, confirming its scalability and practical value for long-term MEC systems.

Key facts. No citing papers in the map yet (data through 14 Oct 2026). Builds on 6 of its 44 references that are in the map. First posted on arXiv 18 Dec 2025.

Builds on

6 of 44 references.

References · 6

  1. 2023Unleashing the Power of Edge-Cloud Generative AI in Mobile Networks: A Survey of AIGC Servicescited by 76
  2. 2023Green Edge AI: A Contemporary Surveycited by 25
  3. 2019ALERT: Accurate Learning for Energy and Timelinesscited by 9
  4. 2019Edge computing server placement with capacitated location allocationcited by 2
  5. 2023Energy-Efficient Deadline-Aware Edge Computing: Bandit Learning with Partial Observations in Multi-Channel Systemscited by 2
  6. 2023A Survey of Computation Offloading with Task Typescited by 1

Built on by

Not cited yet.