From Liability to Asset: A Three-Mode Grid-Forming Control Framework for Centralized Data Center UPS Systems

arXiv 2512.16497 ↗First posted 18 Dec 2025eess.SY cs.SYcited by 1

Not on the map. Why?

Abstract (arXiv)

AI workloads are turning large data centers into highly dynamic power-electronic loads; fault-time behavior and workload pulsing can stress weak-grid points of interconnection. This paper proposes a centralized medium-voltage (MV) uninterruptible power supply (UPS) control architecture implemented as three operating modes: Mode 1 regulates a DC stiff bus and shapes normal-operation grid draw, Mode 2 enforces current-limited fault-mode P--Q priority with UPS battery energy storage system (UPS-BESS) buffering and a rate-limited post-fault "soft return," and Mode 3 optionally provides droop-based fast frequency response via grid-draw modulation. Fundamental-frequency averaged dq simulations (50 MW block, short-circuit ratio (SCR) = 1.5, 0.5 p.u. three-phase dip for 150~ms) show zero unserved information-technology (IT) energy (0.00000 MWh vs.0.00208 MWh for a momentary-cessation benchmark), a 0.57 p.u. peak inverter current (vs. 1.02 p.u. for a synchronous-reference-frame phase-locked loop (SRF-PLL) low-voltage ride-through (LVRT) baseline), a nonzero mean fault-window grid draw of 0.20~p.u. (vs.approx 0 for momentary cessation), and an improved settled point-of-common-coupling (PCC) voltage minimum of 0.79 p.u. after one cycle (vs. 0.66 p.u.). A forced-oscillation case study applies a 1 Hz pulsed load (+/- 0.25 p.u.) and shows that the normal-operation shaping filters the oscillation seen by the grid while the UPS-BESS buffers the pulsing component.

Key facts. Cited by 1 paper in the map (data through 14 Oct 2026). First posted on arXiv 18 Dec 2025.

Builds on

No reference list yet.

Built on by

Cited by year (2026 to 14 Oct)

Citing papers per year: 2026: 1.

1 paper.