mlsanityData to 14 Oct 2026

TFMAdapter: Lightweight Instance-Level Adaptation of Foundation Models for Forecasting with Covariates

arXiv 2509.13906 ↗First posted 17 Sep 2025cs.LGcited by 3

Not on the map. Why?

Abstract (arXiv)

Time Series Foundation Models (TSFMs) have recently achieved state-of-the-art performance in univariate forecasting on new time series simply by conditioned on a brief history of past values. Their success demonstrates that large-scale pretraining across diverse domains can acquire the inductive bias to generalize from temporal patterns in a brief history. However, most TSFMs are unable to leverage covariates -- future-available exogenous variables critical for accurate forecasting in many applications -- due to their domain-specific nature and the lack of associated inductive bias. We propose TFMAdapter, a lightweight, instance-level adapter that augments TSFMs with covariate information without fine-tuning. Instead of retraining, TFMAdapter operates on the limited history provided during a single model call, learning a non-parametric cascade that combines covariates with univariate TSFM forecasts. However, such learning would require univariate forecasts at all steps in the history, requiring too many calls to the TSFM. To enable training on the full historical context while limiting TSFM invocations, TFMAdapter uses a two-stage method: (1) generating pseudo-forecasts with a simple regression model, and (2) training a Gaussian Process regressor to refine predictions using both pseudo- and TSFM forecasts alongside covariates. Extensive experiments on real-world datasets demonstrate that TFMAdapter consistently outperforms both foundation models and supervised baselines, achieving a 24-27% improvement over base foundation models with minimal data and computational overhead. Our results highlight the potential of lightweight adapters to bridge the gap between generic foundation models and domain-specific forecasting needs.

Key facts. Cited by 3 papers in the map (data through 14 Oct 2026). Builds on 20 of its 31 references that are in the map. First posted on arXiv 17 Sep 2025.

Builds on

20 of 31 references.

References · 20

  1. 2019Exploring the Limits of Transfer Learning with a Unified Text-to-Text Transformercited by 14,599
  2. 2023LLaMA: Open and Efficient Foundation Language Modelscited by 14,132
  3. 2014Empirical Evaluation of Gated Recurrent Neural Networks on Sequence Modelingcited by 2,367
  4. 2020Informer: Beyond Efficient Transformer for Long Sequence Time-Series Forecastingcited by 2,169
  5. 2022A Time Series is Worth 64 Words: Long-term Forecasting with Transformerscited by 2,039
  6. 2021Autoformer: Decomposition Transformers with Auto-Correlation for Long-Term Series Forecastingcited by 1,676
  7. 2022FEDformer: Frequency Enhanced Decomposed Transformer for Long-term Series Forecastingcited by 1,210
  8. 2017DeepAR: Probabilistic Forecasting with Autoregressive Recurrent Networkscited by 1,013
  9. 2017Modeling Long- and Short-Term Temporal Patterns with Deep Neural Networkscited by 879
  10. 2024Chronos: Learning the Language of Time Seriescited by 759
  11. 2019N-BEATS: Neural basis expansion analysis for interpretable time series forecastingcited by 753
  12. 2024Unified Training of Universal Time Series Forecasting Transformerscited by 614
8 more
  1. 2024MOMENT: A Family of Open Time-series Foundation Modelscited by 482
  2. 2023Long-term Forecasting with TiDE: Time-series Dense Encodercited by 332
  3. 2024TimeXer: Empowering Transformers for Time Series Forecasting with Exogenous Variablescited by 248
  4. 2024Foundation Models for Time Series Analysis: A Tutorial and Surveycited by 239
  5. 2024GIFT-Eval: A Benchmark For General Time Series Forecasting Model Evaluationcited by 212
  6. 2022N-HiTS: Neural Hierarchical Interpolation for Time Series Forecastingcited by 146
  7. 2021Neural basis expansion analysis with exogenous variables: Forecasting electricity prices with NBEATSxcited by 64
  8. 2019Probabilistic Forecasting with Temporal Convolutional Neural Networkcited by 63

Built on by

Cited by year (2026 to 14 Oct)

Citing papers per year: 2026: 3.

3 papers.