Dataless Neural Networks for Resource-Constrained Project Scheduling
Not on the map. Why?
Abstract (arXiv)
Dataless neural networks represent a paradigm shift in applying neural architectures to combinatorial optimization problems, eliminating the need for training datasets by encoding problem instances directly into network parameters. Despite the pioneering work of Alkhouri et al. (2022) demonstrating the viability of dataless approaches for the Maximum Independent Set problem, our comprehensive literature review reveals that no published work has extended these methods to the Resource-Constrained Project Scheduling Problem (RCPSP). This paper addresses this gap by presenting the first dataless neural network approach for RCPSP, providing a complete mathematical framework that transforms discrete scheduling constraints into differentiable objectives suitable for gradient-based optimization. Our approach leverages smooth relaxations and automatic differentiation to unlock GPU parallelization for project scheduling, traditionally a domain of sequential algorithms. We detail the mathematical formulation for both precedence and renewable resource constraints, including a memory-efficient dense time-grid representation. Implementation and comprehensive experiments on PSPLIB benchmark instances (J30, J60, and J120) are currently underway, with empirical results to be reported in an updated version of this paper.
Key facts. No citing papers in the map yet (data through 14 Oct 2026). Builds on 1 of its 11 references that are in the map. First posted on arXiv 7 Jul 2025.
Builds on
1 of 11 references.
References · 1
- 2024Differentiable Combinatorial Scheduling at Scalecited by 6
Built on by
Not cited yet.