mlsanityData to 14 Oct 2026

MLMC-based Resource Adequacy Assessment with Active Learning Trained Surrogate Models

arXiv 2505.20930 ↗First posted 27 May 2025cs.LGcited by 0

Not on the map. Why?

Abstract (arXiv)

Multilevel Monte Carlo (MLMC) is a flexible and effective variance reduction technique for accelerating reliability assessments of complex power system. Recently, data-driven surrogate models have been proposed as lower-level models in the MLMC framework due to their high correlation and negligible execution time once trained. However, in resource adequacy assessments, pre-labeled datasets are typically unavailable. For large-scale systems, the efficiency gains from surrogate models are often offset by the substantial time required for labeling training data. Therefore, this paper introduces a speed metric that accounts for training time in evaluating MLMC efficiency. Considering the total time budget is limited, a vote-by-committee active learning approach is proposed to reduce the required labeling calls. A case study demonstrates that, within a given computational budget, active learning in combination with MLMC can result in a substantial reduction variance.

Key facts. No citing papers in the map yet (data through 14 Oct 2026). Builds on 3 of its 18 references that are in the map. First posted on arXiv 27 May 2025.

Builds on

3 of 18 references.

References · 3

  1. 2019Accelerating System Adequacy Assessment using the Multilevel Monte Carlo Approachcited by 2
  2. 2018Minimising Unserved Energy Using Heterogeneous Storage Unitscited by 1
  3. 2022Multilevel Monte Carlo with Surrogate Models for Resource Adequacy Assessmentcited by 1

Built on by

Not cited yet.