Updating Lower and Upper Bounds for the Job-Shop Scheduling Problem Test Instances
Not on the map. Why?
Abstract (arXiv)
The Job-Shop Scheduling Problem (JSSP) and its variant, the Flexible Job-Shop Scheduling Problem (FJSSP), are combinatorial optimization problems studied thoroughly in the literature. Generally, the aim is to reduce the makespan of a scheduling solution corresponding to a problem instance. Thus, finding upper and lower bounds for an optimal makespan enables the assessment of performances for multiple approaches addressed so far. We use OR-Tools, a solver portfolio, to compute new bounds for some open benchmark instances, in order to reduce the gap between upper and lower bounds. We find new numerical lower bounds for multiple benchmark instances, up to closing the Taillard's ta33 instance. We also improve upper bounds for four instances, namely Taillard's ta26 & ta45 and Dauzere's 05a & 06a. Additionally we share an optimal solution for Taillard's ta45 as well as Hurink-edata's car5.
Key facts. Cited by 1 paper in the map (data through 14 Oct 2026). First posted on arXiv 17 Apr 2025.
Builds on
No reference list yet.
Built on by
Citing papers per year: 2025: 1.
1 paper.