The Value Problem for Multiple-Environment MDPs with Parity Objective
Not on the map. Why?
Abstract (arXiv)
We consider multiple-environment Markov decision processes (MEMDP), which consist of a finite set of MDPs over the same state space, representing different scenarios of transition structure and probability. The value of a strategy is the probability to satisfy the objective, here a parity objective, in the worst-case scenario, and the value of an MEMDP is the supremum of the values achievable by a strategy. We show that deciding whether the value is 1 is a PSPACE-complete problem, and even in P when the number of environments is fixed, along with new insights to the almost-sure winning problem, which is to decide if there exists a strategy with value 1. Pure strategies are sufficient for theses problems, whereas randomization is necessary in general when the value is smaller than 1. We present an algorithm to approximate the value, running in double exponential space. Our results are in contrast to the related model of partially-observable MDPs where all these problems are known to be undecidable.
Key facts. Cited by 5 papers in the map (data through 14 Oct 2026). First posted on arXiv 22 Apr 2025.
Builds on
No reference list yet.
Built on by
Citing papers per year: 2025: 1; 2026: 4.
5 papers.
- 2025Multi-Environment POMDPs: Discrete Model Uncertainty Under Partial Observabilitycited by 3
- 2026Computing the Reachability Value of Posterior-Deterministic POMDPscited by 1
- 2026Multi-Environment POMDPs with Finite-Horizon Objectivescited by 0
- 2026Synthesizing POMDP Policies: Sampling Meets Model-checking via Learningcited by 0
- 2026On the Complexity Gap Between POMDPs and Multi-Environment POMDPscited by 0
- 2026On the Complexity Gap Between POMDPs and Multi-Environment POMDPs10 Oct 2026
- 2026Synthesizing POMDP Policies: Sampling Meets Model-checking via Learning14 May 2026
- 2026Multi-Environment POMDPs with Finite-Horizon Objectives8 May 2026
- 2026Computing the Reachability Value of Posterior-Deterministic POMDPs7 Feb 2026
- 2025Multi-Environment POMDPs: Discrete Model Uncertainty Under Partial Observability27 Oct 2025