mlsanityData to 14 Oct 2026

Fair Division of Chores with Budget Constraints

arXiv 2410.23979 ↗First posted 31 Oct 2024cs.GT econ.THcited by 3

Not on the map. Why?

Abstract (arXiv)

We study fair allocation of indivisible chores to agents under budget constraints, where each chore has an objective size and disutility. This model captures scenarios where a set of chores need to be divided among agents with limited time, and each chore has a specific time needed for completion. We propose a budget-constrained model for allocating indivisible chores, and systematically explore the differences between goods and chores in this setting. We establish the existence of an EFX allocation. We then show that EF2 allocations are polynomial-time computable in general; for many restricted settings, we strengthen this result to EF1. For divisible chores, we develop an efficient algorithm for computing an EF allocation.

Key facts. Cited by 3 papers in the map (data through 14 Oct 2026). First posted on arXiv 31 Oct 2024.

Builds on

No reference list yet.

Built on by

Cited by year (2026 to 14 Oct)

Citing papers per year: 2025: 2; 2026: 1.

3 papers.