mlsanityData to 14 Oct 2026

Evaluating the Impact of Data Availability on Machine Learning-augmented MPC for a Building Energy Management System

arXiv 2407.13308 ↗First posted 18 Jul 2024eess.SY cs.SYcited by 2

Not on the map. Why?

Abstract (arXiv)

A major challenge in the development of Model Predictive Control (MPC)-based energy management systems (EMSs) for buildings is the availability of an accurate model. One approach to address this is to augment an existing gray-box model with data-driven residual estimators. The efficacy of such estimators, and hence the performance of the EMS, relies on the availability of sufficient and suitable training data. In this work, we evaluate how different data availability scenarios affect estimator and controller performance. To do this, we perform software-in-the-loop (SiL) simulation with a physics-based digital twin using real measurement data. Simulation results show that acceptable estimation and control performance can already be achieved with limited available data, and we confirm that leveraging historical data for pretraining boosts efficacy.

Key facts. Cited by 2 papers in the map (data through 14 Oct 2026). First posted on arXiv 18 Jul 2024.

Builds on

No reference list yet.

Built on by

Cited by year (2026 to 14 Oct)

Citing papers per year: 2025: 1; 2026: 1.

2 papers.