Learning-enabled Flexible Job-shop Scheduling for Scalable Smart Manufacturing
Not on the map. Why?
Abstract (arXiv)
In smart manufacturing systems (SMSs), flexible job-shop scheduling with transportation constraints (FJSPT) is essential to optimize solutions for maximizing productivity, considering production flexibility based on automated guided vehicles (AGVs). Recent developments in deep reinforcement learning (DRL)-based methods for FJSPT have encountered a scale generalization challenge. These methods underperform when applied to environment at scales different from their training set, resulting in low-quality solutions. To address this, we introduce a novel graph-based DRL method, named the Heterogeneous Graph Scheduler (HGS). Our method leverages locally extracted relational knowledge among operations, machines, and vehicle nodes for scheduling, with a graph-structured decision-making framework that reduces encoding complexity and enhances scale generalization. Our performance evaluation, conducted with benchmark datasets, reveals that the proposed method outperforms traditional dispatching rules, meta-heuristics, and existing DRL-based approaches in terms of makespan performance, even on large-scale instances that have not been experienced during training.
Key facts. Cited by 1 paper in the map (data through 7 Oct 2026). Builds on 7 of its 32 references that are in the map. First posted on arXiv 14 Feb 2024.
Builds on
7 of 32 references.
References · 7
- 2016Instance Normalization: The Missing Ingredient for Fast Stylizationcited by 1,187
- 2018Attention, Learn to Solve Routing Problems!cited by 646
- 2021Combinatorial optimization and reasoning with graph neural networkscited by 267
- 2020Learning to Dispatch for Job Shop Scheduling via Deep Reinforcement Learningcited by 139
- 2020Graph Meta Learning via Local Subgraphscited by 89
- 2021Matrix Encoding Networks for Neural Combinatorial Optimizationcited by 89
- 2022On the Generalization of Neural Combinatorial Optimization Heuristicscited by 24
Built on by
Citing papers per year: 2026: 1.
1 paper.
- 2026Variational Approach for Job Shop Schedulingcited by 0
- 2026Variational Approach for Job Shop Scheduling30 Jan 2026