Large-Scale Multi-Robot Assembly Planning for Autonomous Manufacturing
Not on the map. Why?
Abstract (arXiv)
Mobile autonomous robots have the potential to revolutionize manufacturing processes. However, employing large robot fleets in manufacturing requires addressing challenges including collision-free movement in a shared workspace, effective multi-robot collaboration to manipulate and transport large payloads, complex task allocation due to coupled manufacturing processes, and spatial planning for parallel assembly and transportation of nested subassemblies. We propose a full algorithmic stack for large-scale multi-robot assembly planning that addresses these challenges and can synthesize construction plans for complex assemblies with thousands of parts in a matter of minutes. Our approach takes in a CAD-like product specification and automatically plans a full-stack assembly procedure for a group of robots to manufacture the product. We propose an algorithmic stack that comprises: (i) an iterative radial layout optimization procedure to define a global staging layout for the manufacturing facility, (ii) a graph-repair mixed-integer program formulation and a modified greedy task allocation algorithm to optimally allocate robots and robot sub-teams to assembly and transport tasks, (iii) a geometric heuristic and a hill-climbing algorithm to plan collaborative carrying configurations of robot sub-teams, and (iv) a distributed control policy that enables robots to execute the assembly motion plan collision-free. We also present an open-source multi-robot manufacturing simulator implemented in Julia as a resource to the research community, to test our algorithms and to facilitate multi-robot manufacturing research more broadly. Our empirical results demonstrate the scalability and effectiveness of our approach by generating plans to manufacture a LEGO model of a Saturn V launch vehicle with 1845 parts, 306 subassemblies, and 250 robots in under three minutes on a standard laptop computer.
Key facts. No citing papers in the map yet (data through 14 Oct 2026). Builds on 5 of its 38 references that are in the map. First posted on arXiv 31 Oct 2023.
Builds on
5 of 38 references.
References · 5
- 2020Integrated Task and Motion Planningcited by 290
- 2020Optimal Sequential Task Assignment and Path Finding for Multi-Agent Robotic Assembly Planningcited by 13
- 2020Robust Task and Motion Planning for Long-Horizon Architectural Construction Planningcited by 6
- 2023Heterogeneous Coalition Formation and Scheduling with Multi-Skilled Robotscited by 3
- 2020Efficient Trajectory Planning for Multiple Non-holonomic Mobile Robots via Prioritized Trajectory Optimizationcited by 1
Built on by
Not cited yet.