mlsanityData to 14 Oct 2026

Towards Autonomous Excavation Planning

arXiv 2308.11478 ↗First posted 22 Aug 2023cs.ROcited by 2

Not on the map. Why?

Abstract (arXiv)

Excavation plans are crucial in construction projects, dictating the dirt disposal strategy and excavation sequence based on the final geometry and machinery available. While most construction processes rely heavily on coarse sequence planning and local execution planning driven by human expertise and intuition, fully automated planning tools are notably absent from the industry. This paper introduces a fully autonomous excavation planning system. Initially, the site is mapped, followed by user selection of the desired excavation geometry. The system then invokes a global planner to determine the sequence of poses for the excavator, ensuring complete site coverage. For each pose, a local excavation planner decides how to move the soil around the machine, and a digging planner subsequently dictates the sequence of digging trajectories to complete a patch. We showcased our system by autonomously excavating the largest pit documented so far, achieving an average digging cycle time of roughly 30 seconds, comparable to the one of a human operator.

Key facts. Cited by 2 papers in the map (data through 14 Oct 2026). First posted on arXiv 22 Aug 2023.

Builds on

No reference list yet.

Built on by

Cited by year

Citing papers per year: 2024: 1; 2025: 1.

2 papers.