Coordinating Distributed Energy Resources for Reliability can Significantly Reduce Future Distribution Grid Upgrades and Peak Load

arXiv 2306.08717 ↗First posted 14 Jun 2023eess.SY cs.SYcited by 1

Not on the map. Why?

Abstract (arXiv)

Current DER coordination schemes, such as demand-response and VPPs, aim to reduce electricity costs during peak demand events with no consideration of distribution grid reliability. We show that coordinating DERs for grid reliability can significantly reduce both the infrastructure upgrades needed to support future increases in DER and electrification penetrations and peak load. Specifically, using a power flow driven simulation-optimization methodology, we compare the potential reliability improvements with a perfect-foresight centralized DER controller that minimizes reliability violations to a local controller that minimizes consumer electricity cost. We find, for example, that by 2050 with local control, on average 81% of the transformers in a distribution grid experience violations, compared to 28% with centralized control, which simultaneously reduces peak load by 17%. These reductions are achieved with only 5.1% increase in electricity cost. These findings suggest that future incentives for DER adoption should include reliability coordination.

Key facts. Cited by 1 paper in the map (data through 14 Oct 2026). First posted on arXiv 14 Jun 2023.

Builds on

No reference list yet.

Built on by

Cited by year

Citing papers per year: 2023: 1.