Should the Timing of Inspections be Predictable?

arXiv 2304.01385 ↗First posted 3 Apr 2023econ.TH cs.GTcited by 1

Not on the map. Why?

Abstract (arXiv)

A principal hires an agent to work on a long-term project that culminates in a breakthrough or a breakdown. At each time, the agent privately chooses to work or shirk. Working increases the arrival rate of breakthroughs and decreases the arrival rate of breakdowns. To motivate the agent to work, the principal conducts costly inspections. She fires the agent if shirking is detected. We characterize the principal's optimal inspection policy. Predictable inspections are optimal if work primarily generates breakthroughs. Random inspections are optimal if work primarily prevents breakdowns. Crucially, the agent's actions affect the survival rate of the project, which determines his risk attitude over the timing of planned inspections.

Key facts. Cited by 1 paper in the map (data through 14 Oct 2026). First posted on arXiv 3 Apr 2023.

Builds on

No reference list yet.

Built on by

Cited by year

Citing papers per year: 2025: 1.

1 paper.