How to predict and optimise with asymmetric error metrics
Not on the map. Why?
Abstract (arXiv)
In this paper, we examine the concept of the predict and optimise problem with specific reference to the third Technical Challenge of the IEEE Computational Intelligence Society. In this competition, entrants were asked to forecast building energy use and solar generation at six buildings and six solar installations, and then use their forecast to optimize energy cost while scheduling classes and batteries over a month. We examine the possible effect of underforecasting and overforecasting and asymmetric errors on the optimisation cost. We explore the different nature of loss functions for the prediction and optimisation phase and propose to adjust the final forecasts for a better optimisation cost. We report that while there is a positive correlation between these two, more appropriate loss functions can be used to optimise the costs associated with final decisions.
Key facts. Cited by 1 paper in the map (data through 7 Oct 2026). Builds on 10 of its 23 references that are in the map. First posted on arXiv 24 Nov 2022.
Builds on
10 of 23 references.
References · 10
- 2018Machine Learning for Combinatorial Optimization: a Methodological Tour d'Horizoncited by 612
- 2017OptNet: Differentiable Optimization as a Layer in Neural Networkscited by 588
- 2017Smart "Predict, then Optimize"cited by 332
- 2019JANOS: An Integrated Predictive and Prescriptive Modeling Frameworkcited by 27
- 2021The Perils of Learning Before Optimizingcited by 15
- 2021State-of-the-art predictive and prescriptive analytics for IEEE CIS 3rd Technical Challengecited by 8
- 2021How to effectively use machine learning models to predict the solutions for optimization problems: lessons from loss functioncited by 5
- 2022Methodology for forecasting and optimization in IEEE-CIS 3rd Technical Challengecited by 2
- 2022Evolutionary scheduling of university activities based on consumption forecasts to minimise electricity costscited by 2
- 2021Optimal activity and battery scheduling algorithm using load and solar generation forecastcited by 1
Built on by
Citing papers per year: 2022: 1.
1 paper.
- 2022Predict+Optimize Problem in Renewable Energy Schedulingcited by 3
- 2022Predict+Optimize Problem in Renewable Energy Scheduling21 Dec 2022