Transformer Networks for Predictive Group Elevator Control
Not on the map. Why?
Abstract (arXiv)
We propose a Predictive Group Elevator Scheduler by using predictive information of passengers arrivals from a Transformer based destination predictor and a linear regression model that predicts remaining time to destinations. Through extensive empirical evaluation, we find that the savings of Average Waiting Time (AWT) could be as high as above 50% for light arrival streams and around 15% for medium arrival streams in afternoon down-peak traffic regimes. Such results can be obtained after carefully setting the Predicted Probability of Going to Elevator (PPGE) threshold, thus avoiding a majority of false predictions for people heading to the elevator, while achieving as high as 80% of true predictive elevator landings as early as after having seen only 60% of the whole trajectory of a passenger.
Key facts. No citing papers in the map yet (data through 14 Oct 2026). Builds on 1 of its 15 references that are in the map. First posted on arXiv 15 Aug 2022.
Builds on
1 of 15 references.
References · 1
- 2017Attention Is All You Needcited by 60,361
Built on by
Not cited yet.