Distributional regression and its evaluation with the CRPS: Bounds and convergence of the minimax risk
Not on the map. Why?
Abstract (arXiv)
The theoretical advances on the properties of scoring rules over the past decades have broadened the use of scoring rules in probabilistic forecasting. In meteorological forecasting, statistical postprocessing techniques are essential to improve the forecasts made by deterministic physical models. Numerous state-of-the-art statistical postprocessing techniques are based on distributional regression evaluated with the Continuous Ranked Probability Score (CRPS). However, theoretical properties of such evaluation with the CRPS have solely considered the unconditional framework (i.e. without covariates) and infinite sample sizes. We extend these results and study the rate of convergence in terms of CRPS of distributional regression methods. We find the optimal minimax rate of convergence for a given class of distributions and show that the k-nearest neighbor method and the kernel method reach this optimal minimax rate.
Key facts. Cited by 3 papers in the map (data through 7 Oct 2026). Builds on 8 of its 27 references that are in the map. First posted on arXiv 9 May 2022.
Builds on
8 of 27 references.
References · 8
- 2018Neural networks for post-processing ensemble weather forecastscited by 95
- 2020Distributional Random Forests: Heterogeneity Adjustment and Multivariate Distributional Regressioncited by 36
- 2021Machine learning methods for postprocessing ensemble forecasts of wind gusts: A systematic comparisoncited by 34
- 2019Isotonic Distributional Regressioncited by 28
- 2016Combining predictive distributions for statistical post-processing of ensemble forecastscited by 9
- 2019Monotone Least Squares and Isotonic Quantilescited by 7
- 2019Evaluating probabilistic forecasts of extremes using continuous ranked probability score distributionscited by 7
- 2017Forest-based methods and ensemble model output statistics for rainfall ensemble forecastingcited by 5
Built on by
Citing papers per year: 2025: 2; 2026: 1.
3 papers.