Joint Planning of Distributed Generations and Energy Storage in Active Distribution Networks: A Bi-Level Programming Approach

arXiv 2201.05932 ↗First posted 15 Jan 2022eess.SY cs.SY math.OCcited by 5

Not on the map. Why?

Abstract (arXiv)

In order to improve the penetration of renewable energy resources for distribution networks, a joint planning model of distributed generations (DGs) and energy storage is proposed for an active distribution network by using a bi-level programming approach in this paper. In this model, the upper-level aims to seek the optimal location and capacity of DGs and energy storage, while the lower-level optimizes the operation of energy storage devices. To solve this model, an improved binary particle swarm optimization (IBPSO) algorithm based on chaos optimization is developed, and the optimal joint planning is achieved through alternating iterations between the two levels. The simulation results on the PG & E 69-bus distribution system demonstrate that the presented approach manages to reduce the planning deviation caused by the uncertainties of DG outputs and remarkably improve the voltage profile and operational economy of distribution systems.

Key facts. Cited by 5 papers in the map (data through 14 Oct 2026). First posted on arXiv 15 Jan 2022.

Builds on

No reference list yet.

Built on by

Cited by year

Citing papers per year: 2022: 2; 2023: 2; 2024: 1.

5 papers.