Minimizing Reachability Times on Temporal Graphs via Shifting Labels
Not on the map. Why?
Abstract (arXiv)
We study how we can accelerate the spreading of information in temporal graphs via shifting operations; a problem that captures real-world applications varying from information flows to distribution schedules. In a temporal graph there is a set of fixed vertices and the available connections between them change over time in a predefined manner. We observe that, in some cases, shifting some connections, i.e., advancing or delaying them, can decrease the travel time from some vertex (source) to another vertex. We study how we can minimize the maximum time a set of sources needs to reach every vertex, when we are allowed to shift some of the connections. If we restrict the allowed number of changes, we prove that, already for a single source, the problem is NP-hard, and W[2]-hard when parameterized by the number of changes. Then we focus on unconstrained number of changes. We derive a polynomial-time algorithm when there is a single source. When there are two sources, we show that the problem becomes NP-hard; on the other hand, we design an FPT algorithm parameterized by the treewidth of the graph plus the lifetime of the optimal solution, that works for any number of sources. Finally, we provide polynomial-time algorithms for several graph classes.
Key facts. Cited by 1 paper in the map (data through 14 Oct 2026). First posted on arXiv 16 Dec 2021.
Builds on
No reference list yet.
Built on by
Citing papers per year: 2025: 1.
1 paper.
- 2025Approximating Optimal Labelings for Temporal Connectivity23 Apr 2025