mlsanityData to 7 Oct 2026

A new neighborhood structure for job shop scheduling problems

arXiv 2109.02843 ↗First posted 7 Sep 2021cs.AIcited by 0

Not on the map. Why?

Abstract (arXiv)

Job shop scheduling problem (JSP) is a widely studied NP-complete combinatorial optimization problem. Neighborhood structures play a critical role in solving JSP. At present, there are three state-of-the-art neighborhood structures, i.e., N5, N6, and N7. Improving the upper bounds of some famous benchmarks is inseparable from the role of these neighborhood structures. However, these existing neighborhood structures only consider the movement of critical operations within a critical block. According to our experiments, it is also possible to improve the makespan of a scheduling scheme by moving a critical operation outside its critical block. According to the above finding, this paper proposes a new N8 neighborhood structure considering the movement of critical operations within a critical block and the movement of critical operations outside the critical block. Besides, a neighborhood clipping method is designed to avoid invalid movement, reducing the computational time. Tabu search (TS) is a commonly used algorithm framework combined with neighborhood structures. This paper uses this framework to compare the N8 neighborhood structure with N5, N6, and N7 neighborhood structures on four famous benchmarks. The experimental results verify that the N8 neighborhood structure is more effective and efficient in solving JSP than the other state-of-the-art neighborhood structures.

Key facts. No citing papers in the map yet (data through 7 Oct 2026). Builds on 1 of its 32 references that are in the map. First posted on arXiv 7 Sep 2021.

Builds on

1 of 32 references.

References · 1

  1. 2014A Tabu Search/Path Relinking Algorithm to Solve the Job Shop Scheduling Problemcited by 2

Built on by

Not cited yet.