Equitable Scheduling on a Single Machine
Not on the map. Why?
Abstract (arXiv)
We introduce a natural but seemingly yet unstudied generalization of the problem of scheduling jobs on a single machine so as to minimize the number of tardy jobs. Our generalization lies in simultaneously considering several instances of the problem at once. In particular, we have n clients over a period of m days, where each client has a single job with its own processing time and deadline per day. Our goal is to provide a schedule for each of the m days, so that each client is guaranteed to have their job meet its deadline in at least k ≤ m days. This corresponds to an equitable schedule where each client is guaranteed a minimal level of service throughout the period of m days. We provide a thorough analysis of the computational complexity of three main variants of this problem, identifying both efficient algorithms and worst-case intractability results.
Key facts. Cited by 1 paper in the map (data through 14 Oct 2026). First posted on arXiv 9 Oct 2020.
Builds on
No reference list yet.
Built on by
Citing papers per year: 2024: 1.
1 paper.