mlsanityData to 14 Oct 2026

Optimal fast charging station locations for electric ridesharing service with online vehicle-charging station assignment

arXiv 2008.05949 ↗First posted 13 Aug 2020math.OC eess.SPcited by 1

Not on the map. Why?

Abstract (arXiv)

Electrified shared mobility services need to handle charging infrastructure planning and manage their daily charging operations to minimize total charging operation time and cost. However, existing studies tend to address these problems separately. A new online vehicle-charging assignment model is proposed and integrated into the fast charging location problem for dynamic ridesharing services using electric vehicles. The latter is formulated as a bi-level optimization problem to minimize the fleet's daily charging operation time. A surrogate-assisted optimization approach is proposed to solve the combinatorial optimization problem efficiently. The proposed model is tested on a realistic flexible bus service in Luxembourg. The results show that the proposed online charging policy can effectively reduce the charging delays of the fleet compared to the state-of-the-art methods. With 10 additional DC fast chargers installed, charging operation time can be reduced up to 27.8% when applying the online charging policy under the test scenarios.

Key facts. Cited by 1 paper in the map (data through 14 Oct 2026). First posted on arXiv 13 Aug 2020.

Builds on

No reference list yet.

Built on by

Cited by year

Citing papers per year: 2021: 1.

1 paper.