Estimating Probabilistic Safe WCET Ranges of Real-Time Systems at Design Stages
Not on the map. Why?
Abstract (arXiv)
Estimating worst-case execution times (WCET) is an important activity at early design stages of real-time systems. Based on WCET estimates, engineers make design and implementation decisions to ensure that task executions always complete before their specified deadlines. However, in practice, engineers often cannot provide precise point WCET estimates and prefer to provide plausible WCET ranges. Given a set of real-time tasks with such ranges, we provide an automated technique to determine for what WCET values the system is likely to meet its deadlines, and hence operate safely with a probabilistic guarantee. Our approach combines a search algorithm for generating worst-case scheduling scenarios with polynomial logistic regression for inferring probabilistic safe WCET ranges. We evaluated our approach by applying it to three industrial systems from different domains and several synthetic systems. Our approach efficiently and accurately estimates probabilistic safe WCET ranges within which deadlines are likely to be satisfied with a high degree of confidence.
Key facts. Cited by 1 paper in the map (data through 14 Oct 2026). First posted on arXiv 20 Jul 2020.
Builds on
No reference list yet.
Built on by
Citing papers per year: 2024: 1.
1 paper.