Scheduling jobs with release dates on identical parallel machines by minimizing the total weighted completion time
Not on the map. Why?
Abstract (arXiv)
This paper addresses the problem of scheduling a set of jobs that are released over the time on a set of identical parallel machines, aiming at the minimization of the total weighted completion time. This problem, referred to as P|rj|sum wjCj, is of great importance in practice, because it models a variety of real-life applications. Despite its importance, the P|rj|sum wjCj has not received much attention in the recent literature. In this work, we fill this gap by proposing mixed integer linear programs and a tailored branch-and-price algorithm. Our branch-and-price relies on the decomposition of an arc-flow formulation and on the use of efficient exact and heuristic methods for solving the pricing subproblem. Computational experiments carried out on a set of randomly generated instances prove that the proposed methods can solve to the proven optimality instances with up to 200 jobs and 10 machines, and provide very low gaps for larger instances.
Key facts. Cited by 1 paper in the map (data through 14 Oct 2026). First posted on arXiv 20 May 2020.
Builds on
No reference list yet.
Built on by
Citing papers per year: 2021: 1.
1 paper.