Scheduling with Communication Delays via LP Hierarchies and Clustering

arXiv 2004.09682 ↗First posted 21 Apr 2020cs.DScited by 2

Not on the map. Why?

Abstract (arXiv)

We consider the classic problem of scheduling jobs with precedence constraints on identical machines to minimize makespan, in the presence of communication delays. In this setting, denoted by mathsfP mid mathsfprec, c mid C_mathsfmax, if two dependent jobs are scheduled on different machines, then at least c units of time must pass between their executions. Despite its relevance to many applications, this model remains one of the most poorly understood in scheduling theory. Even for a special case where an unlimited number of machines is available, the best known approximation ratio is 2/3 · (c+1), whereas Graham's greedy list scheduling algorithm already gives a (c+1)-approximation in that setting. An outstanding open problem in the top-10 list by Schuurman and Woeginger and its recent update by Bansal asks whether there exists a constant-factor approximation algorithm. In this work we give a polynomial-time O(log c · log m)-approximation algorithm for this problem, where m is the number of machines and c is the communication delay. Our approach is based on a Sherali-Adams lift of a linear programming relaxation and a randomized clustering of the semimetric space induced by this lift.

Key facts. Cited by 2 papers in the map (data through 14 Oct 2026). First posted on arXiv 21 Apr 2020.

Builds on

No reference list yet.

Built on by

Cited by year (2026 to 14 Oct)

Citing papers per year: 2023: 1; 2024: 0; 2025: 0; 2026: 1.

2 papers.