mlsanityData to 14 Oct 2026

Simulated annealing based heuristic for multiple agile satellites scheduling under cloud coverage uncertainty

arXiv 2003.08363 ↗First posted 14 Mar 2020eess.SP cs.AI physics.space-phcited by 8

Not on the map. Why?

Abstract (arXiv)

Agile satellites are the new generation of Earth observation satellites (EOSs) with stronger attitude maneuvering capability. Since optical remote sensing instruments equipped on satellites cannot see through the cloud, the cloud coverage has a significant influence on the satellite observation missions. We are the first to address multiple agile EOSs scheduling problem under cloud coverage uncertainty where the objective aims to maximize the entire observation profit. The chance constraint programming model is adopted to describe the uncertainty initially, and the observation profit under cloud coverage uncertainty is then calculated via sample approximation method. Subsequently, an improved simulated annealing based heuristic combining a fast insertion strategy is proposed for large-scale observation missions. The experimental results show that the improved simulated annealing heuristic outperforms other algorithms for the multiple AEOSs scheduling problem under cloud coverage uncertainty, which verifies the efficiency and effectiveness of the proposed algorithm.

Key facts. Cited by 8 papers in the map (data through 14 Oct 2026). First posted on arXiv 14 Mar 2020.

Builds on

No reference list yet.

Built on by

Cited by year (2026 to 14 Oct)

Citing papers per year: 2022: 1; 2023: 0; 2024: 0; 2025: 1; 2026: 6.

8 papers.