HyperSched: Dynamic Resource Reallocation for Model Development on a Deadline

arXiv 2001.02338 ↗First posted 8 Jan 2020cs.DC cs.LGcited by 6

Not on the map. Why?

Abstract (arXiv)

Prior research in resource scheduling for machine learning training workloads has largely focused on minimizing job completion times. Commonly, these model training workloads collectively search over a large number of parameter values that control the learning process in a hyperparameter search. It is preferable to identify and maximally provision the best-performing hyperparameter configuration (trial) to achieve the highest accuracy result as soon as possible. To optimally trade-off evaluating multiple configurations and training the most promising ones by a fixed deadline, we design and build HyperSched -- a dynamic application-level resource scheduler to track, identify, and preferentially allocate resources to the best performing trials to maximize accuracy by the deadline. HyperSched leverages three properties of a hyperparameter search workload over-looked in prior work - trial disposability, progressively identifiable rankings among different configurations, and space-time constraints - to outperform standard hyperparameter search algorithms across a variety of benchmarks.

Key facts. Cited by 6 papers in the map (data through 14 Oct 2026). First posted on arXiv 8 Jan 2020.

Builds on

No reference list yet.

Built on by

Cited by year

Citing papers per year: 2021: 2; 2022: 1; 2023: 1; 2024: 2.

6 papers.