mlsanityData to 7 Oct 2026

Ridge Regression: Structure, Cross-Validation, and Sketching

arXiv 1910.02373 ↗First posted 6 Oct 2019math.ST stat.ML stat.THcited by 15

Not on the map. Why?

Abstract (arXiv)

We study the following three fundamental problems about ridge regression: (1) what is the structure of the estimator? (2) how to correctly use cross-validation to choose the regularization parameter? and (3) how to accelerate computation without losing too much accuracy? We consider the three problems in a unified large-data linear model. We give a precise representation of ridge regression as a covariance matrix-dependent linear combination of the true parameter and the noise. We study the bias of K-fold cross-validation for choosing the regularization parameter, and propose a simple bias-correction. We analyze the accuracy of primal and dual sketching for ridge regression, showing they are surprisingly accurate. Our results are illustrated by simulations and by analyzing empirical data.

Key facts. Cited by 15 papers in the map (data through 7 Oct 2026). First posted on arXiv 6 Oct 2019.

Builds on

No reference list yet.

Built on by

Cited by year

Citing papers per year: 2021: 3; 2022: 6; 2023: 3; 2024: 2; 2025: 1.

15 papers.

Sort: