In systems engineering, accurately decomposing requirements is crucial for creating well-defined and manageable system components, particularly in safety-critical domains. Despite the critical need, rigorous, top-down methodologies for effectively breaking down complex requirements into precise, actionable sub-requirements are scarce, especially compared to the wealth of bottom-up verification techniques. Addressing this gap, we introduce a formal decomposition for contract-based design that guarantees the correctness of decomposed requirements if specific conditions are met. Our (semi-)automated methodology augments contract-based design with reachability analysis and constraint programming to systematically identify, verify, and validate sub-requirements representable by continuous bounded sets -- continuous relations between real-valued inputs and outputs. We demonstrate the efficacy and practicality of a correct-by-construction approach through a comprehensive case study on a cruise control system, highlighting how our methodology improves the interpretability, tractability, and verifiability of system requirements.
Key facts. Cited by 1 paper in the map (data through 14 Oct 2026). First posted on arXiv 4 Sep 2019.
Builds on
No reference list yet.
Built on by
Citing papers per year: 2025: 1.
1 paper.