Acquisition of Project-Specific Assets with Bayesian Updating
Not on the map. Why?
Abstract (arXiv)
We study the impact of learning on the optimal policy and the time-to-decision in an infinite-horizon Bayesian sequential decision model with two irreversible alternatives, exit and expansion. In our model, a firm undertakes a small-scale pilot project so as to learn, via Bayesian updating, about the projecttextquoteright s profitability, which is known to be in one of two possible states. The firm continuously observes the projecttextquoteright s cumulative profit, but the true state of the profitability is not immediately revealed because of the inherent noise in the profit stream. The firm bases its exit or expansion decision on the posterior probability distribution of the profitability. The optimal policy is characterized by a pair of thresholds for the posterior probability. We find that the time-to-decision does not necessarily have a monotonic relation with the arrival rate of new information.
Key facts. Cited by 1 paper in the map (data through 14 Oct 2026). First posted on arXiv 14 Jan 2019.
Builds on
No reference list yet.
Built on by
Citing papers per year: 2026: 1.
1 paper.