mlsanityData to 14 Oct 2026

Optimal Scheduling of an Isolated Microgrid with Battery Storage Considering Load and Renewable Generation Uncertainties

arXiv 1808.05691 ↗First posted 16 Aug 2018eess.SP math.OCcited by 7

Not on the map. Why?

Abstract (arXiv)

By modeling the uncertainty of spinning reserves provided by energy storage with probabilistic constraints, a new optimal scheduling mode is proposed for minimizing the operating costs of an isolated microgrid (MG) by using chance-constrained programming. The model is transformed into a readily solvable mixed integer linear programming (MILP) formulation in GAMS via a proposed discretized step transformation (DST) approach and finally solved by applying the CPLEX solver. By properly setting the confidence levels of the spinning reserve probability constraints, the MG operation can be achieved a trade-off between reliability and economy. The test results on the modified ORNL DECC lab MG test system reveal that the proposal significantly exceeds the commonly used hybrid intelligent algorithm with much better and more stable optimization results and significantly reduced calculation times.

Key facts. Cited by 7 papers in the map (data through 14 Oct 2026). First posted on arXiv 16 Aug 2018.

Builds on

No reference list yet.

Built on by

Cited by year

Citing papers per year: 2021: 1; 2022: 2; 2023: 3; 2024: 1.

7 papers.