Optimal Scheduling and Exact Response Time Analysis for Multistage Jobs
Not on the map. Why?
Abstract (arXiv)
Scheduling to minimize mean response time in an M/G/1 queue is a classic problem. The problem is usually addressed in one of two scenarios. In the perfect-information scenario, the scheduler knows each job's exact size, or service requirement. In the zero-information scenario, the scheduler knows only each job's size distribution. The well-known shortest remaining processing time (SRPT) policy is optimal in the perfect-information scenario, and the more complex Gittins policy is optimal in the zero-information scenario. In real systems the scheduler often has partial but incomplete information about each job's size. We introduce a new job model, that of multistage jobs, to capture this partial-information scenario. A multistage job consists of a sequence of stages, where both the sequence of stages and stage sizes are unknown, but the scheduler always knows which stage of a job is in progress. We give an optimal algorithm for scheduling multistage jobs in an M/G/1 queue and an exact response time analysis of our algorithm.
Key facts. Cited by 1 paper in the map (data through 14 Oct 2026). First posted on arXiv 17 May 2018.
Builds on
No reference list yet.
Built on by
Citing papers per year: 2025: 1.
1 paper.