Constraint and Mathematical Programming Models for Integrated Port Container Terminal Operations

arXiv 1712.05302 ↗First posted 14 Dec 2017cs.AI math.OCcited by 1

Not on the map. Why?

Abstract (arXiv)

This paper considers the integrated problem of quay crane assignment, quay crane scheduling, yard location assignment, and vehicle dispatching operations at a container terminal. The main objective is to minimize vessel turnover times and maximize the terminal throughput, which are key economic drivers in terminal operations. Due to their computational complexities, these problems are not optimized jointly in existing work. This paper revisits this limitation and proposes Mixed Integer Programming (MIP) and Constraint Programming (CP) models for the integrated problem, under some realistic assumptions. Experimental results show that the MIP formulation can only solve small instances, while the CP model finds optimal solutions in reasonable times for realistic instances derived from actual container terminal operations.

Key facts. Cited by 1 paper in the map (data through 14 Oct 2026). First posted on arXiv 14 Dec 2017.

Builds on

No reference list yet.

Built on by

Cited by year

Citing papers per year: 2025: 1.

1 paper.