mlsanityData to 14 Oct 2026

Submodular Function Maximization for Group Elevator Scheduling

arXiv 1707.00617 ↗First posted 28 Jun 2017cs.AI math.COcited by 1

Not on the map. Why?

Abstract (arXiv)

We propose a novel approach for group elevator scheduling by formulating it as the maximization of submodular function under a matroid constraint. In particular, we propose to model the total waiting time of passengers using a quadratic Boolean function. The unary and pairwise terms in the function denote the waiting time for single and pairwise allocation of passengers to elevators, respectively. We show that this objective function is submodular. The matroid constraints ensure that every passenger is allocated to exactly one elevator. We use a greedy algorithm to maximize the submodular objective function, and derive provable guarantees on the optimality of the solution. We tested our algorithm using Elevate 8, a commercial-grade elevator simulator that allows simulation with a wide range of elevator settings. We achieve significant improvement over the existing algorithms.

Key facts. Cited by 1 paper in the map (data through 14 Oct 2026). First posted on arXiv 28 Jun 2017.

Builds on

No reference list yet.

Built on by

Cited by year

Citing papers per year: 2023: 1.

1 paper.