mlsanityData to 14 Oct 2026

The Dynamic Bowser Routing Problem

arXiv 1705.10609 ↗First posted 30 May 2017math.OCcited by 1

Not on the map. Why?

Abstract (arXiv)

We investigate opportunities offered by telematics and analytics to enable better informed, and more integrated, collaborative management decisions on construction sites. We focus on efficient refuelling of assets across construction sites. More specifically, we develop decision support models that, by leveraging data supplied by different assets, schedule refuelling operations by minimising the distance travelled by the bowser truck as well as fuel shortages. Motivated by a practical case study elicited in the context of a project we recently conducted at Crossrail, we introduce the Dynamic Bowser Routing Problem. In this problem the decision maker aims to dynamically refuel, by dispatching a bowser truck, a set of assets which consume fuel and whose location changes over time; the goal is to ensure that assets do not run out of fuel and that the bowser covers the minimum possible distance. We investigate deterministic and stochastic variants of this problem and introduce effective and scalable mathematical programming models to tackle these cases. We demonstrate the effectiveness of our approaches in the context of an extensive computational study designed around data collected on site as well as supplied by our project partners. Keywords: Routing; Dynamic Bowser Routing Problem; Stochastic Bowser Routing Problem; Mixed-Integer Linear Programming; Construction.

Key facts. Cited by 1 paper in the map (data through 14 Oct 2026). First posted on arXiv 30 May 2017.

Builds on

No reference list yet.

Built on by

Cited by year

Citing papers per year: 2022: 1.

1 paper.