mlsanityData to 14 Oct 2026

Comprehensive Modeling of Three-Phase Distribution Systems via the Bus Admittance Matrix

arXiv 1705.06782 ↗First posted 18 May 2017math.OC cs.SY eess.SYcited by 3

Not on the map. Why?

Abstract (arXiv)

The theme of this paper is three-phase distribution system modeling suitable for the Z-Bus load-flow. Detailed models of wye and delta constant-power, constant-current, and constant-impedance loads are presented. Models of transmission lines, voltage regulators, and transformers that build the bus admittance matrix (Y-Bus) are laid out. The Z-Bus load-flow is then reviewed and the singularity of the Y-Bus in case of certain transformer connections is rigorously discussed. Based on realistic assumptions and conventional modifications, the invertibility of the Y-Bus is proved. Last but not least, the MATLAB scripts that construct the detailed component models for the IEEE 37-bus, IEEE 123-bus, and 8500-node feeders as well as the European 906-bus low-voltage feeder are provided.

Key facts. Cited by 3 papers in the map (data through 14 Oct 2026). First posted on arXiv 18 May 2017.

Builds on

No reference list yet.

Built on by

Cited by year (2026 to 14 Oct)

Citing papers per year: 2026: 3.

3 papers.