mlsanityData to 14 Oct 2026

On the Solution of Large-Scale Robust Transmission Network Expansion Planning under Uncertain Demand and Generation Capacity

arXiv 1609.07902 ↗First posted 26 Sep 2016cs.CEcited by 1

Not on the map. Why?

Abstract (arXiv)

Two-stage robust optimization has emerged as a relevant approach to deal with uncertain demand and generation capacity in the transmission network expansion planning problem. Unfortunately, available solution methodologies for the resulting trilevel robust counterpart are unsuitable for large-scale problems. In order to overcome this shortcoming, this paper presents an alternative column-and-constraint generation algorithm wherein the max-min problem associated with the second stage is solved by a novel coordinate descent method. As a major salient feature, the proposed approach does not rely on the transformation of the second-stage problem to a single-level equivalent. As a consequence, bilinear terms involving dual variables or Lagrange multipliers do not arise, thereby precluding the use of computationally expensive big-M-based linearization schemes. Thus, not only is the computational effort reduced, but also the typically overlooked non-trivial tuning of bounding parameters for dual variables or Lagrange multipliers is avoided. The practical applicability of the proposed methodology is confirmed by numerical testing on several benchmarks including a case based on the Polish 2383-bus system, which is well beyond the capability of the robust methods available in the literature.

Key facts. Cited by 1 paper in the map (data through 14 Oct 2026). First posted on arXiv 26 Sep 2016.

Builds on

No reference list yet.

Built on by

Cited by year

Citing papers per year: 2024: 1.

1 paper.