# Learning-Based Collaborative MEC for LLM Inference with Soft-Deadline Awareness via Transformer-Enhanced PPO

arXiv: https://arxiv.org/abs/2608.02031 · HTML: https://mlsanity.com/paper/2608.02031/

## Key facts

- No citing papers in the map yet (data through 14 Oct 2026).
- Builds on 11 of its 15 references that are in the map.
- First posted on arXiv 3 Aug 2026.

## Builds on (most cited first, 11 of 11)

- [Attention Is All You Need](https://mlsanity.com/paper/1706.03762/) (2017)
- [Megatron-LM: Training Multi-Billion Parameter Language Models Using Model Parallelism](https://mlsanity.com/paper/1909.08053/) (2019)
- [Mobile Edge Intelligence for Large Language Models: A Contemporary Survey](https://mlsanity.com/paper/2407.18921/) (2024)
- [Mobile Edge Computing: A Survey on Architecture and Computation Offloading](https://mlsanity.com/paper/1702.05309/) (2017)
- [Sustainable LLM Inference for Edge AI: Evaluating Quantized LLMs for Energy Efficiency, Output Accuracy, and Inference Latency](https://mlsanity.com/paper/2504.03360/) (2025)
- [A Method for Evaluating Hyperparameter Sensitivity in Reinforcement Learning](https://mlsanity.com/paper/2412.07165/) (2024)
- [PPO-CMA: Proximal Policy Optimization with Covariance Matrix Adaptation](https://mlsanity.com/paper/1810.02541/) (2018)
- [Edge-Cloud Collaborative Computing on Distributed Intelligence and Model Optimization: A Survey](https://mlsanity.com/paper/2505.01821/) (2025)
- [Beyond the Edge: An Advanced Exploration of Reinforcement Learning for Mobile Edge Computing, its Applications, and Future Research Trajectories](https://mlsanity.com/paper/2404.14238/) (2024)
- [LLM-guided DRL for Multi-tier LEO Satellite Networks with Hybrid FSO/RF Links](https://mlsanity.com/paper/2505.11978/) (2025)
- [Deadline-Aware Joint Task Scheduling and Offloading in Mobile Edge Computing Systems](https://mlsanity.com/paper/2507.18864/) (2025)

## Abstract (arXiv)

This paper investigates collaborative mobile edge computing (MEC) servers for large language model (LLM) inference under soft deadline constraints. In this system, to improve the quality of service, computations are expected to be completed within their deadlines. However, due to dependencies among tasks or subtasks, any missed deadline can lead to catastrophic consequences for the entire request. In this context, this work proposes an extended deadline mechanism with constrained flexibility. The main challenges lie in handling large-scale computations under strict latency constraints while limiting the number of allowable deadline extensions, especially in the presence of task dependencies within each request. To tackle these challenges, we develop a transformer-enhanced proximal policy optimization (PPO) framework that enables efficient collaboration among MEC servers. The proposed approach aims to maximize the number of tasks completed within their deadlines while minimizing the use of deadline extensions. By capturing temporal dependencies and cross-server interactions, the transformer improves decision-making for task migration. Simulation results demonstrate that the proposed method significantly outperforms conventional PPO and heuristic-based approaches in terms of task completion rate and overall system efficiency.
