# Long Duration Battery Sizing, Siting, and Operation Under Wildfire Risk Using Progressive Hedging

arXiv: https://arxiv.org/abs/2404.12296 · HTML: https://mlsanity.com/paper/2404.12296/

## Key facts

- Cited by 1 papers in the map (data through 14 Oct 2026).
- First posted on arXiv 18 Apr 2024.

## Built on by (most cited first, 1 of 1)

- [Machine Learning Guided Optimal Transmission Switching to Mitigate Wildfire Ignition Risk](https://mlsanity.com/paper/2510.25147/) (2025)

## Abstract (arXiv)

Battery sizing and siting problems are computationally challenging due to the need to make long-term planning decisions that are cognizant of short-term operational decisions. This paper considers sizing, siting, and operating batteries in a power grid to maximize their benefits, including price arbitrage and load shed mitigation, during both normal operations and periods with high wildfire ignition risk. We formulate a multi-scenario optimization problem for long duration battery storage while considering the possibility of load shedding during Public Safety Power Shutoff (PSPS) events that de-energize lines to mitigate severe wildfire ignition risk. To enable a computationally scalable solution of this problem with many scenarios of wildfire risk and power injection variability, we develop a customized temporal decomposition method based on a progressive hedging framework. Extending traditional progressive hedging techniques, we consider coupling in both placement variables across all scenarios and state-of-charge variables at temporal boundaries. This enforces consistency across scenarios while enabling parallel computations despite both spatial and temporal coupling. The proposed decomposition facilitates efficient and scalable modeling of a full year of hourly operational decisions to inform the sizing and siting of batteries. With this decomposition, we model a year of hourly operational decisions to inform optimal battery placement for a 240-bus WECC model in under 70 minutes of wall-clock time.
