# Towards computing low-makespan solutions for multi-arm multi-task planning problems

arXiv: https://arxiv.org/abs/2305.17527 · HTML: https://mlsanity.com/paper/2305.17527/

## Key facts

- Cited by 1 papers in the map (data through 14 Oct 2026).
- First posted on arXiv 27 May 2023.

## Built on by (most cited first, 1 of 1)

- [ScheduleStream: Temporal Planning with Samplers for GPU-Accelerated Multi-Arm Task and Motion Planning & Scheduling](https://mlsanity.com/paper/2511.04758/) (2025)

## Abstract (arXiv)

We propose an approach to find low-makespan solutions to multi-robot multi-task planning problems in environments where robots block each other from completing tasks simultaneously. We introduce a formulation of the problem that allows for an approach based on greedy descent with random restarts for generation of the task assignment and task sequence. We then use a multi-agent path planner to evaluate the makespan of a given assignment and sequence. The planner decomposes the problem into multiple simple subproblems that only contain a single robots and a single task, and can thus be solved quickly to produce a solution for a fixed task sequence. The solutions to the subproblems are then combined to form a valid solution to the original problem. We showcase the approach on robotic stippling and robotic bin picking with up to 4 robot arms. The makespan of the solutions found by our algorithm are up to 30% lower compared to a greedy approach.
