# Estimating Task Completion Times for Network Rollouts using Statistical Models within Partitioning-based Regression Methods

arXiv: https://arxiv.org/abs/2211.10866 · HTML: https://mlsanity.com/paper/2211.10866/

## Key facts

- No citing papers in the map yet (data through 14 Oct 2026).
- Builds on 1 of its 20 references that are in the map.
- First posted on arXiv 20 Nov 2022.

## Builds on (most cited first, 1 of 1)

- [XGBoost: A Scalable Tree Boosting System](https://mlsanity.com/paper/1603.02754/) (2016)

## Abstract (arXiv)

This paper proposes a data and Machine Learning-based forecasting solution for the Telecommunications network-rollout planning problem. Milestone completion-time estimation is crucial to network-rollout planning; accurate estimates enable better crew utilisation and optimised cost of materials and logistics. Using historical data of milestone completion times, a model needs to incorporate domain knowledge, handle noise and yet be interpretable to project managers. This paper proposes partition-based regression models that incorporate data-driven statistical models within each partition, as a solution to the problem. Benchmarking experiments demonstrate that the proposed approach obtains competitive to better performance, at a small fraction of the model complexity of the best alternative approach based on Gradient Boosting. Experiments also demonstrate that the proposed approach is effective for both short and long-range forecasts. The proposed idea is applicable in any context requiring time-series regression with noisy and attributed data.