# Redundant Robot Assignment on Graphs with Uncertain Edge Costs

arXiv: https://arxiv.org/abs/1810.04016 · HTML: https://mlsanity.com/paper/1810.04016/

## Key facts

- Cited by 2 papers in the map (data through 14 Oct 2026).
- First posted on arXiv 6 Oct 2018.

## Built on by (most cited first, 2 of 2)

- [Beyond Robustness: A Taxonomy of Approaches towards Resilient Multi-Robot Systems](https://mlsanity.com/paper/2109.12343/) (2021)
- [The Holy Grail of Multi-Robot Planning: Learning to Generate Online-Scalable Solutions from Offline-Optimal Experts](https://mlsanity.com/paper/2107.12254/) (2021)

## Abstract (arXiv)

We provide a framework for the assignment of multiple robots to goal locations, when robot travel times are uncertain. Our premise is that time is the most valuable asset in the system. Hence, we make use of redundant robots to counter the effect of uncertainty and minimize the average waiting time at destinations. We apply our framework to transport networks represented as graphs, and consider uncertainty in the edge costs (i.e., travel time). Since solving the redundant assignment problem is strongly NP-hard, we exploit structural properties of our problem to propose a polynomial-time solution with provable sub-optimality bounds. Our method uses distributive aggregate functions, which allow us to efficiently (i.e., incrementally) compute the effective cost of assigning redundant robots. Experimental results on random graphs show that the deployment of redundant robots through our method reduces waiting times at goal locations, when edge traversals are uncertain.
