# Optimal scheduling of isolated microgrid with an electric vehicle battery swapping station in multi-stakeholder scenarios: a bi-level programming approach via real-time pricing

arXiv: https://arxiv.org/abs/1809.10206 · HTML: https://mlsanity.com/paper/1809.10206/

## Key facts

- Cited by 2 papers in the map (data through 14 Oct 2026).
- First posted on arXiv 26 Sep 2018.

## Built on by (most cited first, 2 of 2)

- [Wind Power Forecasting Considering Data Privacy Protection: A Federated Deep Reinforcement Learning Approach](https://mlsanity.com/paper/2211.02674/) (2022)
- [Optimal scheduling of island integrated energy systems considering multi-uncertainties and hydrothermal simultaneous transmission: A deep reinforcement learning approach](https://mlsanity.com/paper/2212.13472/) (2022)

## Abstract (arXiv)

In order to coordinate the scheduling problem between an isolated microgrid (IMG) and electric vehicle battery swapping stations (BSSs) in multi-stakeholder scenarios, a new bi-level optimal scheduling model is proposed for promoting the participation of BSSs in regulating the IMG economic operation. In this model, the upper-level sub-problem is formulated to minimize the IMG net costs, while the lower-level aims to maximize the profits of the BSS under real-time pricing environments determined by demand responses in the upper-level decision. To solve the model, a hybrid algorithm, called JAYA-BBA, is put forward by combining a real/integer-coded JAYA algorithm and the branch and bound algorithm (BBA), in which the JAYA and BBA are respectively employed to address the upper- and lower- level sub-problems, and the bi-level model is eventually solved through alternate iterations between the two levels. The simulation results on a microgrid test system verify the effectiveness and superiority of the presented approach.
